Permit Application Status
PRSF230553
You will only be able to schedule inspections if you are a contact on the permit application.
Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.
Paid Fees | Amount | Paid | Owing | Date Paid |
---|---|---|---|---|
Routt County Planning Dept Plan Review Fee | $75.00 | $75.00 | Paid | 06/08/2023 |
Steamboat Springs Fire Department: Plan Review Fee | $25.00 | $25.00 | Paid | 06/22/2023 |
Routt County Use Tax Fee | $7,915.69 | $7,915.69 | Paid | 06/22/2023 |
Building Permit Fee | $5,666.40 | $5,666.40 | Paid | 06/22/2023 |
Plan Review Fee | $3,683.16 | $3,683.16 | Paid | 06/08/2023 |
Outstanding Fees | Amount | Paid | Owing | Date Paid |
No outstanding fees. | ||||
Totals: | $17,365.25 | $17,365.25 | $0.00 |
$0.00
Inspection | Outcome | Requested | Scheduled | Date Inspected |
---|---|---|---|---|
Footing Inspection | Pending | |||
Roofing Inspection | Pending | |||
Drywall Inspection | Pending | |||
Grading Inspection | Pending | |||
Mike Mordi Send Email | ||||
Final Grading Inspection | Pending | |||
Tony Brown ((970) 870-5344) Send Email | ||||
Building Final Inspection | Pending | |||
Foundation Water Proofing | Pending | |||
Foundation/Underslab Insulation | Pending | |||
Lath/Veneer Inspection | Pending | |||
Shower Pan Inspection | Pending | |||
Foundation Inspection | Pending | |||
Structural Inspection | Pending | |||
Foundation Inspection | Partial Pass | 10/27/2023 | 10/27/2023 | 10/27/2023 |
Jeff Yeiser ((970) 870-5371) Send Email | ||||
Foundation Inspection | Partial Pass | 10/30/2023 | 10/30/2023 | 10/30/2023 |
Jeff Yeiser ((970) 870-5371) Send Email | ||||
Insulation Inspection | Partial Pass | 11/14/2023 | 11/14/2023 | 11/14/2023 |
Jeff Yeiser ((970) 870-5371) Send Email | ||||
Foundation Drain Inspection | Partial Pass | 11/22/2023 | 11/22/2023 | 11/22/2023 |
Silas Ebbert ((970) 870-5347) Send Email | ||||
Foundation Drain Inspection | Passed | 12/1/2023 | 12/1/2023 | 12/01/2023 |
Jeff Yeiser ((970) 870-5371) Send Email | ||||
Radon Piping | Passed | 12/18/2023 | 12/18/2023 | 12/18/2023 |
Jeff Yeiser ((970) 870-5371) Send Email | ||||
Insulation Inspection | Partial Pass | 2/1/2024 | 2/1/2024 | 02/01/2024 |
Jeff Yeiser ((970) 870-5371) Send Email | ||||
Framing Inspection | Not Ready | 3/1/2024 | 3/1/2024 | 03/01/2024 |
Jeff Yeiser ((970) 870-5371) Send Email | ||||
Miscellaneous
Carried Forward
03/01/2024
1. Add H2.5 clips to rafters and trusses, not missed, not completed
2. Main door needs 2nd king
3. Garage trusses need one row ow bracing as specified
|
||||
Wall/Roof Sheeting | Passed | 3/27/2024 | 3/27/2024 | 03/27/2024 |
Jeff Yeiser ((970) 870-5371) Send Email | ||||
Framing Inspection | Partial Pass | 3/27/2024 | 3/27/2024 | 03/27/2024 |
Jeff Yeiser ((970) 870-5371) Send Email | ||||
Miscellaneous
Resolved
03/27/2024
1. Add H2.5 clips to rafters and trusses, not missed, not completed
2. Main door needs 2nd king
3. Garage trusses need one row ow bracing as specified
|
||||
Framing Inspection | Passed | 4/22/2024 | 4/22/2024 | 04/22/2024 |
Jeff Yeiser ((970) 870-5371) Send Email | ||||
Insulation Inspection | Passed | 4/30/2024 | 4/30/2024 | 04/30/2024 |
Jeff Yeiser ((970) 870-5371) Send Email | ||||
Structural Inspection | Partial Pass | 5/3/2024 | 05/03/2024 | |
Jeff Yeiser ((970) 870-5371) Send Email |
Condition | Status | Department | Category | Expiration Date | Due Date |
---|---|---|---|---|---|
Certified Survey of Foundation | Open | Planning and Land Use | Prior to Full Building Permit Issuance | ||
:
A foundation only building permit will initially be signed off on by Planning. Prior to Planning signing off on the full building permit, a certified survey of the location of the foundation forms must be submitted.
|
|||||
Miscellaneous | Open | Building Services | Prior to Full Building Permit Issuance | ||
:
A foundation only building permit will initially be signed off on by Routt County Regional Building Department (RCRBD). Prior to RCRBD signing off on the full building permit, the following deferred items shall be submitted:
DEFERRED SUBMITTALS
1. SITE RETAINING WALL ENGINEERING.
2. FIRE SPRINKLERS, AS REQUIRED.
3. HEAT LOAD CALCULATIONS.
4. ENGINEERED TRUSS DRAWINGS.
5. SPECIAL INSPECTION REPORTS
|
|||||
Blower door test results | Open | Building Services | Prior to Issuance of TCO/CO/CC | ||
:
Deferred blower door test reports and commissioning reports shall be submitted prior to issuance of CO/TCO.
|
|||||
Design Engineer on-site Wastewater final report | Open | Environmental Health | Prior to Issuance of TCO/CO/CC | ||
:
Design Engineer on-site Wastewater final report, including as Built plans.
|
|||||
Miscellaneous | Resolved | Fire Prevention | Prior to Rough Building Wall Inspections | ||
:
Conditionally Approved –NO INSPECTIONS deferred submittal until RECEIPT of Fire Alarm/Sprinkler plan/permits by sub-contractor to Fire Prevention. See www.steamboatsprings.net/Fire and EMS Services/Fire Prevention/Downloadable Permits and Forms
|
|||||
Final Fire Inspection Required | Open | Fire Prevention | Prior to Issuance of TCO/CO/CC | ||
:
Final Fire Alarm and Sprinkler Inspections Required
|
|||||
Miscellaneous | Open | Building Services | Prior to Issuance of TCO/CO/CC | ||
:
The owner and/or owners representative shall be responsible for contracting the special inspector and obtaining sufficient data throughout the rw construction to satisfy the requirements of the local governing authority to secure approval of the retaining wall construction and by performing the duties outlined in approved plans.
|
Reference Number | Status | Type |
---|---|---|
PREL231001 | Permit(s) Issued | Electrical |
PRPL231086 | Permit(s) Issued | Plumbing |
PRMH231087 | Permit(s) Issued | Mechanical |
PRMH240292 | Permit(s) Issued | Mechanical |
PREL240308 | Permit(s) Issued | Electrical |