CityView Portal

Permit Application Status

PRSL221199


You will only be able to schedule inspections if you are a contact on the permit application.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRSL221199
Solar
Permit(s) Issued
SOBESKI, LUKE & JAYME (JT)
New
Install two ground mounted solar poles. Each pole will hold six solar panels. Homeowner doing the work
08/26/2022
10/05/2022
10/05/2025

Locations

Submittals

1 Permit Application Submittal 08/26/2022      Status: Returned for Correction

Review Type Outcome Est. Completion Date Completed
Electrical Review Approved 09/05/2022 09/02/2022
Tom Cook ((970) 870-5339)   Send Email
final approval subject to field inspection
Building Code Review Failed 09/05/2022 08/31/2022
Ted Allen ((970) 870-5329)   Send Email
Miscellaneous
Carried Forward
09/22/2022


Ground-mounted photovoltaic systems shall be designed and installed in accordance with Section R301. PRSF220380 has all design loads, soil bearing pressure(s), etc. Submit engineering design documents (calculations) demonstrating compliance of structural components and elements (include footing, center tube, cross pieces, rails and connections) with adequate provisions to document location, loads used and program design basis as per R301.1.3 Engineered design.
GIS Land Development Review Approved 09/05/2022 08/31/2022
Laura Meyers ((970) 870-5464)   Send Email
Existing address okay
Planning Review Failed 09/05/2022 08/29/2022
Michael Fitz ((970) 879-2704)   Send Email
Miscellaneous
Carried Forward
09/22/2022


Obtain approval of Solar Energy System permit, PL20220080, through Planning.
Cannot approve until corresponding Planning permit is approved.

2 Permit Application Submittal 09/06/2022      Status: Returned for Correction

Review Type Outcome Est. Completion Date Completed
Planning Review Failed 09/29/2022 09/23/2022
Michael Fitz ((970) 879-2704)   Send Email
Miscellaneous
Carried Forward
10/05/2022


Obtain approval of Solar Energy System permit, PL20220080, through Planning. Administrative decision date is scheduled for 9/27, so this Correction may soon resolve itself.
Correction updated.
Building Code Review Approved 09/29/2022 09/22/2022
Todd Carr ((970) 870-5330)   Send Email
Miscellaneous
Outstanding
09/22/2022


Ground-mounted photovoltaic systems shall be designed and installed in accordance with Section R301. PRSF220380 has all design loads, soil bearing pressure(s), etc. Submit engineering design documents (calculations) demonstrating compliance of structural components and elements (include footing, center tube, cross pieces, rails and connections) with adequate provisions to document location, loads used and program design basis as per R301.1.3 Engineered design.
Resubmittal approved

3 Permit Application Submittal 09/26/2022      Status: Pending

Review Type Outcome Est. Completion Date Completed
Planning Review Approved 10/06/2022 10/05/2022
Michael Fitz ((970) 879-2704)   Send Email
Miscellaneous
Resolved
10/05/2022


Obtain approval of Solar Energy System permit, PL20220080, through Planning. Administrative decision date is scheduled for 9/27, so this Correction may soon resolve itself.
PL20220080 approved. This permit is approved for FOUNDATION ONLY until concrete piers are located.

Fees

Paid Fees Amount Paid Owing Date Paid
Residential Solar Permit Fee - Routt $224.25 $224.25 Paid 10/05/2022
Residential Solar Plan Review Fee - Routt $145.75 $145.75 Paid 08/26/2022
Routt County Planning Dept Plan Review Fee $75.00 $75.00 Paid 08/26/2022
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Foundation Inspection Pending
Roofing Inspection Pending
Building Final Inspection Pending
Structural Inspection Pending
Footing Inspection Passed 10/6/2022 10/6/2022 10/06/2022
Tom Cook ((970) 870-5339)   Send Email

Conditions

Condition Status Department Category Expiration Date Due Date
Certified Survey of Foundation Open Prior to Full Building Permit Issuance
: A foundation only building permit will initially be signed off on by Planning. Prior to Planning signing off on the full building permit, a certified survey of the location of the foundation forms must be submitted.

Related Permit & Planning Applications

There are no related items for this permit application.

Documents & Images