Summary

PRNR230616
New Commercial Building
Closed
PIRTLAW PARTNERS, LTD.
New
B - Business
R-1 - Residential, hotels
Hunting camp permitting for buildings that were constructed around 1974 and 2009. One80 Outdoors, INC (dba: One80 Outfitters) operates a hunting and guiding business for big game in NW Colorado. Colorado Outfitter #: 0003199. Our only hunting lease is with Wolf Mountain Ranch, LLC (WMR) for approximately 18,500 acres. We operate out of WMR hunting camp facilities, 45370 RCR 52. WMR is partnered with Colorado Parks and Wildlife (CPW) in the CPW Ranching for Wildlife (RFW) program. One80 Outdoors, Inc. employs six guides and one camp cook for a maximum of 35 days of big game hunting. The hunting calendar is from the first week of September to the third week of October (7 weeks; Per CPW regulation we cannot begin hunts until September 2 of each year). Our hunt week runs from Sunday afternoon when guests arrive, hunting Monday morning through Friday Morning, and all staff and guests are off the ranch by noon on Friday. We have 2 days between each hunt week to rest the property. Total hunt count for 2023 is 84 private hunters. This is 12 hunters per week for 7 weeks, including staff we will have a total of no more than 20 individuals in camp per 5-day hunt week. All individuals sign WMR and One80 Outfitters liability waivers before accessing the property. Hunting camp is not commercially occupied during the remainder of the year, and generally not used by the ranch family or personnel for any purpose other than a hunting camp. Hunting camp is closed for all winter months. The building permit application is for the Wolf Mountain Ranch (WMR) Hunting Camp. Camp consists of 7 main buildings, 3 sleeping cabins/bedroom only(216sqft.), cook cabin/ commons building (976sqft.), Bathhouse cabin (240sqft.), guide cabin/bedroom only(225sqft), staff cabin/bedroom only (160sqft.). We also have an Ag building/ loafing shed, storage trailer on wheels, generator shed less than 120 sqft., old outhouse less than 120 sqft., and another storage shed less than 120 sqft., all exempt from permits.
06/15/2023
07/07/2023
07/07/2026
08/16/2023

Locations

Submittals

1 Permit Application Submittal 06/15/2023      Status: Pending

Review Type Outcome Est. Completion Date Completed
COO Review - Environmental Health Approved 08/15/2023 08/15/2023
Rick Melzer ((970) 870-5588)   Send Email
COO Review - Building Code Approved 08/15/2023 08/09/2023
Heidi Spengler ((970) 870-5332)   Send Email
All building complete.
GIS Land Development Review Approved 06/29/2023 07/07/2023
Lauren Wade ((970) 870-5465)   Send Email
Planning Review Approved 06/29/2023 07/06/2023
Blake Kelly ((970) 879-2704)   Send Email
The related Planning Permit, PL20230043, was approved by Planning Commission on 6/29/2023. There is a five day appeal period. The Planning Review will be complete by 7/6/2023 if no appeal has been received. [Blake Kelly @ 06/30/2023 9:59 AM] No appeal has been received for PL20230043. This review consists of: Cook house, bathhouse, three client bunkhouses, one guide cabin, and one staff cabin proposed on 5,237-acre AF-zoned parcel. Parcel has a new and active use permit, and these facilities are within the scope of the CUP. Scope of review is limited to these building - other features shown on the site plan are not being reviewed for compliance. Setbacks and height are fine and no other Planning concerns exist.
External Agencies Review Approved 06/29/2023 07/03/2023
Malea Michael-Ferrier ((970) 870-5334)   Send Email
West Routt Fire - westrouttfire7@gmail.com Approved TG WRFPD
Building Code Review Approved 06/29/2023 06/29/2023
Todd Carr ((970) 870-5330)   Send Email
These buildings that make up the Hunting Cabin have been there for years, the buildings are only used for about a 5 to 6 week period of the year during the fall of the year, they are not approved as year round dwellings or even considered a dwelling, these are approved as temporary use buildings only to be used during the time period in accordance with the Planning Departments approval letter which is 5 to 6 weeks out of the year. The buildings are not to be used outside of this time period, owners are responsible to remove snow from the roofs during the winter months since they are not constructed to meet snow loads, and all inspections annually after winter to ensure all structural members have not suffered any damage. Field inspections will address all other code compliant items such as stairs, handrails and guardrails outside, all termination of gas fire appliances with respect to clearances to combustibles, and distances to operable windows, and testing of all plumbing fixtures.
Electrical Review Approved 06/29/2023 06/29/2023
Tom Cook ((970) 870-5339)   Send Email
electrical correction made by Dome Mountain Electric and final completed 6-27-23
Public Works Review Approved 06/29/2023 06/29/2023
Tony Brown ((970) 870-5344)   Send Email
Environmental Health Review Approved 06/29/2023 06/20/2023
Rick Melzer ((970) 870-5588)   Send Email
see conditions
Environmental Health Review Approved 06/29/2023 06/19/2023
Christopher Peters ((970) 870-5354)   Send Email
An OWTS design and permit must be submitted by 12/1/2023. The system must be approved and installed during the summer of 2024 and operational before hunters return in September 2024.

Fees

Paid Fees Amount Paid Owing Date Paid
Routt County Use Tax Fee $310.00 $310.00 Paid 07/07/2023
Steamboat Springs Fire Department: Plan Review Fee $25.00 $25.00 Paid 07/07/2023
Building Permit Fee $163.13 $163.13 Paid 07/07/2023
Plan Review Fee $106.03 $106.03 Paid 06/15/2023
Routt County Planning Dept Plan Review Fee $75.00 $75.00 Paid 06/15/2023
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Foundation Drain Inspection VOID 08/07/2023
Todd Carr ((970) 870-5330)   Send Email
Foundation Water Proofing VOID 08/07/2023
Todd Carr ((970) 870-5330)   Send Email
Foundation/Underslab Insulation VOID 08/07/2023
Todd Carr ((970) 870-5330)   Send Email
Wall/Roof Sheeting VOID 08/07/2023
Todd Carr ((970) 870-5330)   Send Email
Foundation Inspection VOID 08/07/2023
Todd Carr ((970) 870-5330)   Send Email
Footing Inspection VOID 08/07/2023
Todd Carr ((970) 870-5330)   Send Email
Drywall Inspection VOID 08/07/2023
Todd Carr ((970) 870-5330)   Send Email
Insulation Inspection VOID 08/07/2023
Todd Carr ((970) 870-5330)   Send Email
Framing Inspection VOID 08/07/2023
Todd Carr ((970) 870-5330)   Send Email
Grading Inspection VOID 08/07/2023
Todd Carr ((970) 870-5330)   Send Email
Final Grading Inspection VOID 08/07/2023
Todd Carr ((970) 870-5330)   Send Email
Lath/Veneer Inspection VOID 08/07/2023
Todd Carr ((970) 870-5330)   Send Email
Structural Inspection VOID 08/07/2023
Todd Carr ((970) 870-5330)   Send Email
Building Final Inspection Passed 8/7/2023 8/8/2023 08/08/2023
Silas Ebbert ((970) 870-5347)   Send Email

Conditions

Condition Status Department Category Expiration Date Due Date
Design Engineer on-site Wastewater final report Open Environmental Health Prior to Issuance of CO/CC
: Design Engineer on-site Wastewater final report, including as Built plans.
Miscellaneous Open Environmental Health Prior to Operation
: An OWTS permit and design must be approved by 12/1/2023 and installed during the summer of 2024 before hunters arrive for the 2024 hunting season.
Miscellaneous Open Environmental Health Prior to Issuance of CO/CC
: Retail Food Pre-operational inspection and license required
Building Department Conditions to be Completed Resolved Building Services Prior to Issuance of CO/CC
: Certificate of Completion to be provided upon passing final inspection: These buildings that make up the Hunting Cabin have been there for years, the buildings are only used for about a 5 to 6 week period of the year during the fall of the year, they are not approved as year round dwellings or even considered a dwelling, these are approved as temporary use buildings only to be used during the time period in accordance with the Planning Departments approval letter which is 5 to 6 weeks out of the year. The buildings are not to be used outside of this time period, owners are responsible to remove snow from the roofs during the winter months since they are not constructed to meet snow loads, and all inspections annually after winter to ensure all structural members have not suffered any damage. Field inspections will address all other code compliant items such as stairs, handrails and guardrails outside, all termination of gas fire appliances with respect to clearances to combustibles, and distances to operable windows, and testing of all plumbing fixtures.

Related Permit & Planning Applications

Reference Number Status Type
PREL230580 Closed Electrical
PRPL230871 Closed Plumbing

Documents & Images

Date Uploaded File Type Name
07/07/2023 Plans Bath Cabin (Received)
07/07/2023 Plans Cooks Cabin (Received)
07/07/2023 Plans Guide Cabin (Received)
07/07/2023 Plans Sleeping Cabin (Received)
07/07/2023 Plans Staff Cabin (Received)
06/15/2023 Plans Bath Cabin
06/15/2023 Plans Cooks Cabin
06/15/2023 Plans Guide Cabin
06/15/2023 Plans Sleeping Cabin
06/15/2023 Plans Staff Cabin
06/15/2023 Plans HuntCampUtility060123
06/15/2023 Photograph CH wood cook stove chimney
06/15/2023 Photograph CH wood cook stove
06/15/2023 Photograph CH wood heat stove chimney
06/15/2023 Photograph CH wood heat stove
06/15/2023 Photograph GC wood heat stove chimney
06/15/2023 Photograph GC wood heat stove
06/15/2023 Plans Site Plan 45370 CR 52 5-17-23
06/15/2023 Plans Vicinity_map 45370 CR 52 5-17-23
06/15/2023 Report Energy Code Hunting Camp
06/15/2023 Routt County Building Department- One80 ADA Letter
06/15/2023 Other U factor spec sheet
06/15/2023 Other U factor spec sheet
06/15/2023 Other House Warmer propane heater manual
06/15/2023 Other House warmer propane spec/clearance sheet
06/15/2023 Plans New Kitchen layout
06/15/2023 Receipt Receipt for transaction:2023-000646
07/07/2023 Letter Permit - Detailed
07/07/2023 Receipt Receipt for transaction:2023-000786
08/08/2023 Report Inspection Report (Building Final Inspection)
08/08/2023 Report Inspection Report (Building Final Inspection)
08/16/2023 Other Certificate of Occupancy