CityView Portal

Permit Application Submittals

PRAB220245

919271001

Accessory Building


Current Submittal

Submittal #4) Permit Application Submittal (10/14/2022)
Type Status Date Verified
Structural Plans

Structural Plans

Additional Information

Colorado State law says that if documents are prepared by a licensed professional, that professional must sign and seal them. Required for any Structural Alterations, Additions, or New Construction.
Received 10/20/2022
Extended Description: Colorado State law says that if documents are prepared by a licensed professional, that professional must sign and seal them. Required for any Structural Alterations, Additions, or New Construction.

No documents are required at this time.

Site Plan

Site Plan

Additional Information

Please submit Site Plan showing location of bathroom.
Received 10/20/2022
Extended Description: Colorado State law says that if documents are prepared by a licensed professional, that professional must sign and seal them. Required for all construction work that will be expanding outward or upward from the existing building, and for all fences, signs and retaining walls being added.

No documents are required at this time.

Soil Report

Soil Report

Additional Information

These submittals are required for all New Construction or Additions
Received 10/20/2022
Extended Description: These submittals are required for all New Construction or Additions

No documents are required at this time.

Architectural Plans

Architectural Plans

Additional Information

Please submit floor plan showing layout of bathroom.
Received 10/20/2022
Extended Description: Architectual Plans

No documents are required at this time.

Other / Miscellaneous

Other / Miscellaneous

Additional Information

Updated architectural plans showing ADA standards and insulation specifications
Pending
Extended Description:

No documents are required at this time.

Previous Submittals

Submittal #3) Permit Application Submittal (08/24/2022)

Type Status Date Verified
Returned for Corrections

Returned for Corrections

Additional Information

No Additional Information Available.
Pending
Structural Plans

Structural Plans

Additional Information

Colorado State law says that if documents are prepared by a licensed professional, that professional must sign and seal them. Required for any Structural Alterations, Additions, or New Construction.
Received 10/03/2022
Site Plan

Site Plan

Additional Information

Please submit Site Plan showing location of bathroom.
Received 10/03/2022
Soil Report

Soil Report

Additional Information

These submittals are required for all New Construction or Additions
Received 10/03/2022
Architectural Plans

Architectural Plans

Additional Information

Please submit floor plan showing layout of bathroom.
Received 10/03/2022

Submittal #2) Permit Application Submittal (05/02/2022)

Type Status Date Verified
Returned for Corrections

Returned for Corrections

Additional Information

No Additional Information Available.
Pending
Structural Plans

Structural Plans

Additional Information

Colorado State law says that if documents are prepared by a licensed professional, that professional must sign and seal them. Required for any Structural Alterations, Additions, or New Construction.
Received 08/22/2022
Site Plan

Site Plan

Additional Information

Please submit Site Plan showing location of bathroom.
Received 08/22/2022
Soil Report

Soil Report

Additional Information

These submittals are required for all New Construction or Additions
Received 08/22/2022
Architectural Plans

Architectural Plans

Additional Information

Please submit floor plan showing layout of bathroom.
Received 08/22/2022

Submittal #1) Permit Application Submittal (03/18/2022)

Type Status Date Verified
Photos

Photos

Additional Information

No Additional Information Available.
Not Required
Construction Specifications

Construction Specifications

Additional Information

These submittals are required for all New Construction of Additions
Not Required
MEP Plans

MEP Plans

Additional Information

These submittals are required for all New Construction of Additions
Not Required
Heat Load Calculations

Heat Load Calculations

Additional Information

These submittals are required for all New Construction of Additions
Not Required
Civil Plans

Civil Plans

Additional Information

Colorado State law says that if documents are prepared by a licensed professional, that professional must sign and seal them. These submittals are required for all New Construction or Additions:
Not Required
Landscape plan

Landscape plan

Additional Information

Colorado State law says that if documents are prepared by a licensed professional, that professional must sign and seal them. Only required for new commercial buildings.
Not Required
Utility Plan

Utility Plan

Additional Information

These submittals are required for all New Construction or Additions: Not Available is utility work permit also needed for that
Not Required
Returned for Corrections

Returned for Corrections

Additional Information

No Additional Information Available.
Pending
Structural Plans

Structural Plans

Additional Information

Colorado State law says that if documents are prepared by a licensed professional, that professional must sign and seal them. Required for any Structural Alterations, Additions, or New Construction.
Received 03/18/2022
Soil Report

Soil Report

Additional Information

These submittals are required for all New Construction or Additions
Received 03/18/2022
Site Plan

Site Plan

Additional Information

Please submit Site Plan showing location of bathroom.
Received 03/25/2022
Architectural Plans

Architectural Plans

Additional Information

Please submit floor plan showing layout of bathroom.
Received 03/25/2022