Type |
Status |
Date Verified |
Structural Plans
|
Received
|
11/29/2022
|
|
|
|
Extended Description: |
Colorado State law says that if documents are prepared by a licensed professional, that professional must sign and seal them. Required for any Structural Alterations, Additions, or New Construction.
|
No documents are required at this time.
|
Construction Specifications
|
Received
|
11/29/2022
|
|
|
|
Extended Description: |
These submittals are required for all New Construction of Additions
|
No documents are required at this time.
|
MEP Plans
|
Not Required
|
|
Extended Description: |
These submittals are required for all New Construction of Additions
|
No documents are required at this time.
|
Heat Load Calculations
|
Not Required
|
|
Extended Description: |
These submittals are required for all New Construction of Additions
|
No documents are required at this time.
|
Site Plan
|
Received
|
11/29/2022
|
|
|
|
Extended Description: |
Colorado State law says that if documents are prepared by a licensed professional, that professional must sign and seal them. Required for all construction work that will be expanding outward or upward from the existing building, and for all fences, signs and retaining walls being added.
|
No documents are required at this time.
|
Architectural Plans
|
Not Required
|
|
Extended Description: |
Architectual Plans
|
No documents are required at this time.
|
Other / Miscellaneous
|
Received
|
11/29/2022
|
|
|
|
|
|
|
|
|
|
Extended Description: |
|
No documents are required at this time.
|