B-21-572
Demolition/Deconstruction
Closed
HOME RANCH LLC
Demolition
Work Description: Demo of Main house of Home Ranch BedroomsNoEx: 0 BedroomsNoProp: 0 HeightofConstructionEx: 0.00 HeightofConstructionProp: 0.00 LivingAreaEx: 0.00 LivingAreaProp: 0.00 SignLength: 0.00 SignWidth: 0.00 StoriesNoEx: 0 StoriesNoProp: 0 TotalAreaEx: 0.00 TotalAreaProp: 0.00
05/17/2021
06/10/2021
06/10/2024
01/31/2022

Locations

Submittals

There are no submittals for this permit application.

Unlinked Reviews

Review Type Outcome Est. Completion Date Completed
Legacy Permitting Review Not Required 06/10/2021
SysAdmin
VP legacy plan review: North Routt Fire sysadmin - Jun 10 2021 9:43AM - Not reviewed by NRF
Planning Review Approved 06/03/2021
SysAdmin
VP legacy plan review: Routt Planning/Zoning sysadmin - Jun 3 2021 4:17PM - No planning/zoning concerns with proposed demo project.
Road and Bridge Review Approved 06/03/2021
SysAdmin
VP legacy plan review: Routt Road & Bridge/Engineering
Environmental Health Review Approved w/ Conditions 06/02/2021
SysAdmin
VP legacy plan review: Routt Environmental Health sysadmin - Jun 2 2021 10:19AM - Abandonment of Tank 1. A tank may be completely removed and the parts disposed of safely. 2. If the tank will remain in place: a. The tank must be pumped to remove as much waste as possible; b. The bottom of the tank must be broken so the tank neither floats nor fills with water; c. The top must be collapsed and the sides may be broken into the void; d. The remaining void must be filled with gravel, sand or compacted soil; and e. The filled excavation will be graded to surroundings, allowing for settling.
GIS Land Development Review Approved 06/02/2021
SysAdmin
VP legacy plan review: Routt Addressing/GIS
Building Code Review Approved w/ Conditions 06/02/2021
SysAdmin
VP legacy plan review: Routt Building sysadmin - Jun 2 2021 8:55AM - De-Construction Permit Applicants: 1. Applicant/Owner responsible to notify all utility companies or AHJ's of any possible disconnections. 2. Call for Locates 3. Call for final inspections once structure is completely deconstructed and site is cleaned up. 4. Apply and Obtain a Building Permit prior to any repair work, alterations, or construction work needs to be done to any structures that are remaining on site in which the De-constructed structure may have attached too, De-Construction Permit does not include repair work or alterations.

Fees

Paid Fees Amount Paid Owing Date Paid
Building Permit Fee $30.00 $30.00 Paid 05/18/2021
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Demolition Inspection Passed 01/31/2022
Todd Carr ((970) 870-5330)   Send Email

Conditions

There are no conditions for this permit application.

Related Permit & Planning Applications

There are no related items for this permit application.

Documents & Images

Date Uploaded File Type Name
06/02/2021 Legacy Permit Document C-1-0_Lodge De-Con.pdf
06/02/2021 Legacy Permit Document C-1-1_Lodge De-Con.pdf
06/02/2021 Legacy Permit Document C-1-2_Lodge De-Con.pdf
06/02/2021 Legacy Permit Document Signed asbestos form.pdf
06/10/2021 Legacy Permit Document B-21-572 RECORD SET.pdf