Permit Application Status

PRSF231571


You will only be able to schedule inspections if you are a contact on the permit application.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRSF231571
New Single Family Dwelling
Permit(s) Issued
SUNN RANCH LLC
New
R-3 - Residential, one- and two-family
Construction of new single family dwelling
11/02/2023
04/19/2027
04/19/2027

Locations

Submittals

1 Permit Application Submittal 11/02/2023      Status: Returned for Correction

Documents Returned For Corrections

Review Type Outcome Est. Completion Date Completed
Public Works Review Approved 11/20/2023 11/21/2023
Tony Brown ((970) 870-5344)   Send Email
Building Code Review Failed 11/20/2023 11/13/2023
Ted Allen ((970) 870-5329)   Send Email
Miscellaneous
Resolved
01/03/2024


Architectural and structural plans are marked "Progress Prints.” Resubmit plans that are for construction.
Miscellaneous
Outstanding
01/03/2024


Data created by accepted soil science methodologies indicate expansive soils in Routt County, therefore compressible soils, shifting soils or other questionable soil characteristics are likely to be present. The building official requires a soil test to determine the soil’s characteristics at a particular location. This test shall be done by an approved agency using an approved method per R401.4 Soil tests. Foundation design pressures from the report shall be used to evaluate the foundation design (not 1500 psf with no minimum psf). Outstanding: While the WWTS plans referenced in your email and uploaded to the application is under review by the other agencies, RCRBD felt that there were items that are needed before finishing our review. Please submit soil report promised last week along with revised foundation plans as applicable.
Miscellaneous
Resolved
01/03/2024


The construction of buildings and structures shall result in a system that provides a complete load path capable of transferring all loads from their point of origin through the load-resisting elements to the foundation. In light-frame construction, the lateral force-resisting system (LFRS) comprises shear walls, diaphragms, and their interconnections to form a whole-building system. Provide details that identify a load path distribution of required lateral load resisting components (i.e., roof diaphragm, wall bracing, cripple walls, etc.), particularly the lack of continuous shear walls with positive connection to foundations.
Miscellaneous
Resolved
01/03/2024


Where supported by attachment to an exterior wall, decks shall be positively anchored to the primary structure and designed for both vertical and lateral loads as applicable. Where the lateral load connections are provided in accordance with Figure R507.9.2(2), the hold-down tension devices shall be installed in not less than four locations per deck, and each device shall have an allowable stress design capacity of not less than 750 pounds (3336 N). Provide details for deck attachments to house including complying attachment (not to be accomplished by the use of toenails or nails subject to withdrawal) as shown in code. Include joist hangers as applicable.
Environmental Health Review Failed 11/20/2023 11/07/2023
Christopher Peters ((970) 870-5354)   Send Email
This project requires an onsite waste water treatment system (OWTS). Please apply for OWTS permit through RCDEH by doing the following; *Application, application fee $1000.00 as well as OWTS engineered design & Site Plan *Please visit the Routt County website / Environmental Health / Apply for a septic permit / *Please call Environmental Health when application is completed, that is how we make the fee payable. Be sure to scroll all the way down to bottom of page for payment. *Upload engineered design and site plan to Documents and images on your application; this is located in the column on the right https://cityview2.iharriscomputer.com/RouttCountyPortal
GIS Land Development Review Approved 11/20/2023 11/06/2023
Lauren Wade ((970) 870-5465)   Send Email
Primary residence will have the existing primary address: 12300 County Road 56
Planning Review Approved 11/20/2023 11/03/2023
Michael Fitz ((970) 879-2704)   Send Email
Single-family home proposed on 47-acre AF-zoned parcel. Setbacks/height/skyline/waterbody setbacks OK. Existing CUP will remain for the hunting/outfitting operation, as this property still includes permanent staging facilities for hunting.

2 Permit Application Submittal 11/22/2023      Status: Returned for Correction

Review Type Outcome Est. Completion Date Completed
Environmental Health Review Failed 01/05/2024 01/04/2024
Christopher Peters ((970) 870-5354)   Send Email
Awaiting an as-built report for OWTS from western geotech
Building Code Review Failed 01/05/2024 01/03/2024
Ted Allen ((970) 870-5329)   Send Email
Miscellaneous
Resolved
01/03/2024


Architectural and structural plans are marked "Progress Prints.” Resubmit plans that are for construction.
Miscellaneous
Carried Forward
02/14/2024


Data created by accepted soil science methodologies indicate expansive soils in Routt County, therefore compressible soils, shifting soils or other questionable soil characteristics are likely to be present. The building official requires a soil test to determine the soil’s characteristics at a particular location. This test shall be done by an approved agency using an approved method per R401.4 Soil tests. Foundation design pressures from the report shall be used to evaluate the foundation design (not 1500 psf with no minimum psf).While the WWTS plans referenced in your email and uploaded to the application is under review by the other agencies, RCRBD felt that there were items that are needed before finishing our review. Please submit soil report promised last week along with revised foundation plans as applicable (Assumed 1500 psf maybe 2000 PSF per Structural Plans.is unacceptable). The load-bearing values in Table R401.4.1 do not take minimum soil pressure recommendations into consideration and shall not be assumed.
Miscellaneous
Resolved
01/03/2024


The construction of buildings and structures shall result in a system that provides a complete load path capable of transferring all loads from their point of origin through the load-resisting elements to the foundation. In light-frame construction, the lateral force-resisting system (LFRS) comprises shear walls, diaphragms, and their interconnections to form a whole-building system. Provide details that identify a load path distribution of required lateral load resisting components (i.e., roof diaphragm, wall bracing, cripple walls, etc.), particularly the lack of continuous shear walls with positive connection to foundations.
Miscellaneous
Resolved
01/03/2024


Where supported by attachment to an exterior wall, decks shall be positively anchored to the primary structure and designed for both vertical and lateral loads as applicable. Where the lateral load connections are provided in accordance with Figure R507.9.2(2), the hold-down tension devices shall be installed in not less than four locations per deck, and each device shall have an allowable stress design capacity of not less than 750 pounds (3336 N). Provide details for deck attachments to house including complying attachment (not to be accomplished by the use of toenails or nails subject to withdrawal) as shown in code. Include joist hangers as applicable.

3 Permit Application Submittal 01/04/2024      Status: Pending

Review Type Outcome Est. Completion Date Completed
Environmental Health Review Approved 02/22/2024 02/21/2024
Christopher Peters ((970) 870-5354)   Send Email
OWTS designed for the Yurt is considered adequate for the two bedroom cabin. The bath house will be considered an accessory bathroom for use by the inhabitants of the cabin, See conditions [Christopher Peters @ 02/21/2024 12:16 PM]
Building Code Review Approved 02/22/2024 02/14/2024
Ted Allen ((970) 870-5329)   Send Email
Miscellaneous
Resolved
02/14/2024


Data created by accepted soil science methodologies indicate expansive soils in Routt County, therefore compressible soils, shifting soils or other questionable soil characteristics are likely to be present. The building official requires a soil test to determine the soil’s characteristics at a particular location. This test shall be done by an approved agency using an approved method per R401.4 Soil tests. Foundation design pressures from the report shall be used to evaluate the foundation design (not 1500 psf with no minimum psf).While the WWTS plans referenced in your email and uploaded to the application is under review by the other agencies, RCRBD felt that there were items that are needed before finishing our review. Please submit soil report promised last week along with revised foundation plans as applicable (Assumed 1500 psf maybe 2000 PSF per Structural Plans.is unacceptable). The load-bearing values in Table R401.4.1 do not take minimum soil pressure recommendations into consideration and shall not be assumed.

Fees

Paid Fees Amount Paid Owing Date Paid
Routt County Use Tax Fee $900.00 $900.00 Paid 02/24/2024
Routt County Planning Dept Plan Review Fee $75.00 $75.00 Paid 11/02/2023
Building Permit Fee $1,171.58 $1,171.58 Paid 02/24/2024
Plan Review Fee $761.53 $761.53 Paid 11/02/2023
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection Pending
Foundation Inspection Pending
Foundation Drain Inspection Pending
Foundation Water Proofing Pending
Foundation/Underslab Insulation Pending
Framing Inspection Pending
Wall/Roof Sheeting Pending
Roofing Inspection Pending
Insulation Inspection Pending
Radon Piping Pending
Shower Pan Inspection Pending
Drywall Inspection Pending
Grading Inspection Pending
Mike Mordi   Send Email
Final Grading Inspection Pending
Tony Brown ((970) 870-5344)   Send Email
Lath/Veneer Inspection Pending
Building Final Inspection Pending
Structural Inspection Pending

Conditions

Condition Status Department Category Expiration Date Due Date
Miscellaneous Open Environmental Health Prior to Issuance of CO/CC
: Connection from cabin to OWTS stub out must be observed by RCDEH or Western Slope Geotech [Christopher Peters @ 02/28/2024 8:36 AM]
Blower door test results Open Building Services Prior to Issuance of CO/CC
: Blower Door Test Results
Heat Loss Calculations Deferred Submittal Open Building Services Prior to Mechanical Permit Issuance for Heat
: Heal Load Calculations must be submitted, reviewed and approved prior to any heating equipment being installed.

Related Permit & Planning Applications

There are no related items for this permit application.

Documents & Images