Summary

PRAB220245
Accessory Building
Closed
HOME RANCH LLC
New
A new bathroom building will be construction from regular stud walls with log siding siting on a traditional concrete foundation.
03/18/2022
10/25/2022
09/19/2023

Locations

Property
919271001

Submittals

1 Permit Application Submittal 03/18/2022      Status: Returned for Correction

Review Type Outcome Est. Completion Date Completed
Planning Review Approved 04/07/2022 06/08/2022
Chris Brookshire ((970) 879-2704)   Send Email
PUD has been recorded.
GIS Land Development Review Approved 04/07/2022 04/07/2022
Jason Blair ((970) 870-5465)   Send Email
Restroom facility only. No address required.
Environmental Health Review Failed 04/07/2022 04/06/2022
Scott Cowman ((970) 870-5401)   Send Email
Provide information on septic systems to ensure adequate size and function, as well as appropriate permitting of all systems.
Building Code Review Failed 04/07/2022 04/05/2022
Ted Allen ((970) 870-5329)   Send Email
See Document Markups
Carried Forward
08/22/2022


Based on the Work Description - A new bathroom building will be construction from regular stud walls with log siding siting on a traditional concrete foundation; The Home Ranch has been operating as a guest ranch since 1978. It has been open to the public since then.there have been revisions to their PUD over the years and they also have associated permits such as horseback riding or cross country ski tours as an amenity to the ranch. Routt County Regional Building Department (RCRBD) typically requires the architect or registered design professional to provide a code analysis using the 2018 International Building Code. IBC Chapter 29 regulates the minimum number of plumbing fixtures that must be provided for every type of building. The regulations in this chapter come directly from Chapters 3 and 4 of the International Plumbing Code (IPC). Provide a calculation to show that total of water closets, lavatories and service sinks that are to be provided to include provisions for accessibility, as applicable. Also clarify if there is any reason to list the IRC as an applicable code and correct all reference code sections to relevant code as applicable.
See Document Markups
Carried Forward
08/22/2022


Will the bathroom structure be heated? If so:Depending on path to compliance a minimum of R-10 insulation is required from the top of the slab (or concretewall shown on the Structural) downward 24” or 48" (without gaps). Indicate R-5 insulation under slab if slab isheated. Also provide documentation that the structure meets the path chosen to follow for compliance.
Public Works Review Approved 04/07/2022 04/04/2022
Tony Brown ((970) 870-5344)   Send Email
External Agencies Review Approved 04/07/2022 03/28/2022
Malea Michael-Ferrier ((970) 870-5334)   Send Email
N. Routt Fire Reviewed the plan for the new outdoor toilets, no issues with the project. Thanks, Mike

2 Permit Application Submittal 05/02/2022      Status: Returned for Correction

Review Type Outcome Est. Completion Date Completed
Building Code Review Failed 08/25/2022 08/23/2022
Ted Allen ((970) 870-5329)   Send Email
See Document Markups
Carried Forward
10/03/2022


Water closets, lavatories and service sinks that are to be provided to include provisions for accessibility, as applicable. Also clarify if there is any reason to list the IRC as an applicable code and correct all reference code sections to relevant code as applicable.See pavilian permit for comments regarding large events.
See Document Markups
Carried Forward
10/03/2022


Will the bathroom structure be heated? If so:Depending on path to compliance a minimum of R-10 insulation is required from the top of the slab (or concretewall shown on the Structural) downward 24” or 48" (without gaps). Indicate R-5 insulation under slab if slab isheated. Also provide documentation that the structure meets the path chosen to follow for compliance.
Environmental Health Review Failed 08/25/2022 08/22/2022
Heather Savalox ((970) 870-5588)   Send Email
Previously failed due to the lack of information on septic system connections (per Scott Cowman: Provide information on septic systems to ensure adequate size and function, as well as appropriate permitting of all systems.)

3 Permit Application Submittal 08/24/2022      Status: Returned for Correction

Review Type Outcome Est. Completion Date Completed
Environmental Health Review Failed 10/10/2022 10/14/2022
Amanda Williams ((970) 870-5588)   Send Email
Provide information on septic systems to ensure adequate size and function, as well as appropriate permitting of all systems. In a nutshell NWCC needs to get appropriate information to RCEH
Building Code Review Failed 10/10/2022 10/05/2022
Ted Allen ((970) 870-5329)   Send Email
See Document Markups
Carried Forward
10/20/2022


Water closets, lavatories and service sinks that are to be provided to include provisions for accessibility, as applicable. Also clarify if there is any reason to list the IRC as an applicable code and correct all reference code sections to relevant code as applicable.See pavilian permit for comments regarding large events.
See Document Markups
Carried Forward
10/20/2022


Will the bathroom structure be heated? If so:Depending on path to compliance a minimum of R-10 insulation is required from the top of the slab (or concretewall shown on the Structural) downward 24” or 48" (without gaps). Indicate R-5 insulation under slab if slab isheated. Also provide documentation that the structure meets the path chosen to follow for compliance.
While the document that was uploaded and approved by RCRBD Building Official Todd Carr, there are still unresolved comments. Please respond to the Outstanding Document Markups for resubmiital requirements for plan review.

4 Permit Application Submittal 10/14/2022      Status: Pending

Review Type Outcome Est. Completion Date Completed
COO Review - Building Code Approved 09/19/2023 09/19/2023
Heidi Spengler ((970) 870-5332)   Send Email
All building complete.
COO Review - GIS Land Development Approved 09/19/2023 09/14/2023
Lauren Wade ((970) 870-5465)   Send Email
Environmental Health Review Approved 10/28/2022 10/24/2022
Amanda Williams ((970) 870-5588)   Send Email
Building Code Review Approved 10/28/2022 10/21/2022
Ted Allen ((970) 870-5329)   Send Email
See Document Markups
Resolved
10/21/2022


Water closets, lavatories and service sinks that are to be provided to include provisions for accessibility, as applicable. Also clarify if there is any reason to list the IRC as an applicable code and correct all reference code sections to relevant code as applicable.See pavilian permit for comments regarding large events.
See Document Markups
Resolved
10/21/2022


Will the bathroom structure be heated? If so:Depending on path to compliance a minimum of R-10 insulation is required from the top of the slab (or concretewall shown on the Structural) downward 24” or 48" (without gaps). Indicate R-5 insulation under slab if slab isheated. Also provide documentation that the structure meets the path chosen to follow for compliance.

Fees

Paid Fees Amount Paid Owing Date Paid
Routt County Use Tax Fee $1,128.00 $1,128.00 Paid 10/25/2022
Routt County Planning Dept Plan Review Fee $75.00 $75.00 Paid 03/21/2022
Building Permit Fee $1,529.42 $1,529.42 Paid 10/25/2022
Plan Review Fee $994.12 $994.12 Paid 03/21/2022
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Framing Inspection Passed 11/2/2022 11/3/2022 11/03/2022
Silas Ebbert ((970) 870-5347)   Send Email
Insulation Inspection Passed 11/28/2022 11/28/2022 11/28/2022
Ron Norton ((970) 870-5331)   Send Email
Footing Inspection VOID 09/12/2023
Heidi Spengler ((970) 870-5332)   Send Email
Foundation Inspection VOID 09/12/2023
Heidi Spengler ((970) 870-5332)   Send Email
Foundation Drain Inspection VOID 09/12/2023
Heidi Spengler ((970) 870-5332)   Send Email
Roofing Inspection VOID 09/12/2023
Heidi Spengler ((970) 870-5332)   Send Email
Drywall Inspection VOID 09/12/2023
Heidi Spengler ((970) 870-5332)   Send Email
Grading Inspection VOID 09/12/2023
Heidi Spengler ((970) 870-5332)   Send Email
Final Grading Inspection VOID 09/12/2023
Heidi Spengler ((970) 870-5332)   Send Email
Building Final Inspection Passed 9/12/2023 9/12/2023 09/12/2023
Ron Norton ((970) 870-5331)   Send Email

Conditions

There are no conditions for this permit application.

Related Permit & Planning Applications

Reference Number Status Type
PRPL221629 Closed Plumbing
PREL221662 Closed Electrical