Permit Application Status
PRSF240568
You will only be able to schedule inspections if you are a contact on the permit application.
Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.
Summary
Property Owner's Full Name:
Locations
Submittals
1 Permit Application Submittal 06/04/2024
Status: Returned for Correction
Documents Returned For Corrections
Review Type
Outcome
Est. Completion Date
Completed
External Agencies Review
Approved
06/28/2024
06/27/2024
Reviewer:
Reviewer Comments:
YVEA - inspections@yvea.com
If new electrical service is needed, applicant will need to fill out an application on YVEA.com
Environmental Health Review
Failed
06/28/2024
06/25/2024
Reviewer:
Reviewer Comments:
This home requires an OWTS (Septic) permit, fees, and Engineered design prior to RCDEH approval. [Christopher Peters @ 06/25/2024 12:14 PM]
Please apply for OWTS permit through RCDEH by doing the following;
*Application, application fee $1000.00 as well as OWTS engineered design & Site Plan
*Please visit the Routt County website / Environmental Health / Apply for a septic permit /
*Please call Environmental Health when application is completed, that is how we make the fee payable. Be sure to scroll all the way down to bottom of page for payment.
*Upload engineered design and site plan to Documents and images on your application; this is located in the column on the right
https://cityview2.iharriscomputer.com/RouttCountyPortal
When paying folks must log into their City View account. They need to look for Environmental Health permits this is different from my permits. Once they find this they will click on their permit and move fees to cart and follow prompts for payment
Public Works Review
Approved
06/28/2024
06/25/2024
Reviewer:
Reviewer Comments:
Building Code Review
Failed
06/28/2024
06/19/2024
Reviewer:
Corrections:
Correction 1:
Miscellaneous
Comments:
Construction documents shall indicate the solar-ready zone per RS402.2 and also designate the EV ready space per RV502.3 and indicate the locations of raceway and/or conduit and the termination points serving them and shall indicate at least one potential pathway for routing of conduit and/or raceway from the solar-ready zone to the electrical service panel and shall be labeled as “Potential Pathway” on the construction documents.
I have set conditions for deferred heat load calculations, and blower door test to be completed with either an Energy Recovery Ventilator (ERV) or Heat Recovery Ventilator (HRV) installed subject to field inspection (STFI). The thickness of ceiling insulation shall be written in inches (mm) on markers that are installed at not less than one for every 300 square feet (28 m2) throughout the attic space as per R303.1.1.1. Buildings with combustible ceiling or roof construction shall have an attic access opening to attic areas in accordance with Section R807.1.
I have also set conditions for deferred truss submittal.
Reviewer Comments:
Planning Review
Failed
06/28/2024
06/17/2024
Reviewer:
Corrections:
Correction 1:
Miscellaneous
Comments:
Address provided is 32855 County Road 5. This appears to be for parcel 969264001, which is listed as 32755 County Road 5.
Correction 2:
Miscellaneous
Comments:
Site plans have multiple issues. There appear to be 3 of them. One site plan pre-dates the existence of this parcel and is a GIS screenshot with an area circled in black marker. One site plan is in the Architectural drawings, and one is hand-drawn. The Architectural drawing conflicts with the hand-drawn plan, with one claiming a 280' north setback and one claiming 250'. Neither site plan conveys the enough information. King Creek runs through this parcel and there is a waterbody setback which is measured to the high water mark. Please provide one site plan which identifies the setbacks to all property lines, and to King Creek. Please also remove all conflicting site plans from the application.
Reviewer Comments:
SIngle-family home proposed on 68 acre AF-zoned parcel. Height complies. Skyline N/A. Cannot measure setbacks or waterbody setbacks on site plans, and address is incorrect. See Corrections for details.
GIS Land Development Review
Approved
06/28/2024
06/17/2024
Reviewer:
Reviewer Comments:
2 Permit Application Submittal 06/27/2024
Status: Returned for Correction
Review Type
Outcome
Est. Completion Date
Completed
Environmental Health Review
Failed
07/25/2024
07/22/2024
Reviewer:
Reviewer Comments:
OWTS preliminary soils classification is required prior to approval of this building permit. OWTS permit # PRSP240209 was conditionally approved April 3, 2024 with the understanding that the soils classification would commence when the site conditions allowed. Snow is no longer an impediment to conducting this work. [Christopher Peters @ 07/22/2024 8:48 AM]
Planning Review
Approved
07/25/2024
07/18/2024
Reviewer:
Corrections:
Correction 1:
Miscellaneous
Comments:
Address provided is 32855 County Road 5. This appears to be for parcel 969264001, which is listed as 32755 County Road 5.
Correction 2:
Miscellaneous
Comments:
Site plans have multiple issues. There appear to be 3 of them. One site plan pre-dates the existence of this parcel and is a GIS screenshot with an area circled in black marker. One site plan is in the Architectural drawings, and one is hand-drawn. The Architectural drawing conflicts with the hand-drawn plan, with one claiming a 280' north setback and one claiming 250'. Neither site plan conveys the enough information. King Creek runs through this parcel and there is a waterbody setback which is measured to the high water mark. Please provide one site plan which identifies the setbacks to all property lines, and to King Creek. Please also remove all conflicting site plans from the application.
Reviewer Comments:
Address/location has been corrected and site plan has been fixed.
Building Code Review
Approved
07/25/2024
07/18/2024
Reviewer:
Corrections:
Correction 1:
Miscellaneous
Comments:
Construction documents shall indicate the solar-ready zone per RS402.2 and also designate the EV ready space per RV502.3 and indicate the locations of raceway and/or conduit and the termination points serving them and shall indicate at least one potential pathway for routing of conduit and/or raceway from the solar-ready zone to the electrical service panel and shall be labeled as “Potential Pathway” on the construction documents.
I have set conditions for deferred heat load calculations, and blower door test to be completed with either an Energy Recovery Ventilator (ERV) or Heat Recovery Ventilator (HRV) installed subject to field inspection (STFI). The thickness of ceiling insulation shall be written in inches (mm) on markers that are installed at not less than one for every 300 square feet (28 m2) throughout the attic space as per R303.1.1.1. Buildings with combustible ceiling or roof construction shall have an attic access opening to attic areas in accordance with Section R807.1.
I have also set conditions for deferred truss submittal.
Reviewer Comments:
3 Permit Application Submittal 07/22/2024
Status: Pending
Review Type
Outcome
Est. Completion Date
Completed
COO Review - Building Code
Failed
03/04/2025
03/05/2025
Reviewer:
Reviewer Comments:
CO/TCO not approved. Must pass all final inspections and submit documents for open conditions.
COO Review - Environmental Health
Failed
03/04/2025
03/04/2025
Reviewer:
Reviewer Comments:
RCDEH sent a letter 9/25/2025 to Mr. Swary stating that the soils observed on site during the installation inspection (PRSP 240209) were not in agreement with the design engineers classifiaction. The department asked that the design engineer be notified and a larger system designed for the more restrictive soils observed onsite. RCDEH not recieved the new desgn and have not received an as-built drawing or report from the engineer indicating that the changes have been made. Plase contact RCDEH with any questions. See Conditions. [Christopher Peters @ 03/04/2025 8:04 AM]
Environmental Health Review
Approved
08/14/2024
08/14/2024
Reviewer:
Reviewer Comments:
PRSP240209 has been issued and fees paid. The soils classification for the OWTS must be confirmed during the installation inspection (see History comments). The system was designed for a five bedroom home with plans for future expansion of the system. see Conditions. [Christopher Peters @ 08/14/2024 2:25 PM] [Christopher Peters @ 08/14/2024 2:25 PM]
Fees
There are no fees for this permit application, or you are not authorized to view them.
Inspections
Inspection
Outcome
Requested
Scheduled
Date Inspected
Foundation Water Proofing
Pending
Inspector:
Foundation/Underslab Insulation
Pending
Inspector:
Wall/Roof Sheeting
Pending
Inspector:
Roofing Inspection
Pending
Inspector:
Radon Piping
Pending
Inspector:
Shower Pan Inspection
Pending
Inspector:
Drywall Inspection
Pending
Inspector:
Grading Inspection
Pending
Inspector:
Mike Mordi
Send Email
Final Grading Inspection
Pending
Inspector:
Tony Brown
((970) 870-5344)
Send Email
Lath/Veneer Inspection
Pending
Inspector:
Building Final Inspection
Pending
Inspector:
Structural Inspection
Pending
Inspector:
Footing Inspection
Pending
Inspector:
Foundation Inspection
Pending
Inspector:
Framing Inspection
Pending
Inspector:
Building Final Inspection
Pending
Inspector:
Footing Inspection
Partial Pass
9/5/2024
9/5/2024
09/05/2024
Inspector:
Jeff Yeiser
((970) 870-5371)
Send Email
Foundation Inspection
Partial Pass
9/12/2024
9/13/2024
09/13/2024
Inspector:
Jeff Yeiser
((970) 870-5371)
Send Email
Foundation Drain Inspection
Passed
9/12/2024
9/13/2024
09/13/2024
Inspector:
Jeff Yeiser
((970) 870-5371)
Send Email
Framing Inspection
Partial Pass
9/23/2024
9/24/2024
09/24/2024
Inspector:
Jeff Yeiser
((970) 870-5371)
Send Email
Insulation Inspection
Partial Pass
10/14/2024
10/15/2024
10/15/2024
Inspector:
Ron Norton
((970) 870-5331)
Send Email
Insulation Inspection
Passed
11/19/2024
11/20/2024
11/20/2024
Inspector:
Jeff Yeiser
((970) 870-5371)
Send Email
Building Final Inspection
Partial Pass
2/25/2025
02/25/2025
Inspector:
Jeff Yeiser
((970) 870-5371)
Send Email
Conditions
Condition
Status
Category
Blower door test results
Open
Prior to Issuance of CO/CC
Heat Loss Calculations Deferred Submittal
Open
Prior to Mechanical Permit Issuance for Heat
Truss Drawings Deferred Submittal
Open
Prior to Issuance of CO/CC
Design Engineer on-site Wastewater final report
Open
Prior to Issuance of TCO/CO/CC
Miscellaneous
Open
Prior to Issuance of TCO/CO/CC
Building Department Conditions to be Completed
Open
Prior to Issuance of CO/CC
Related Permit & Planning Applications