Permit Application Submittals

PRPF230984

18195 STATE HIGHWAY 131, ROUTT, CO 80483

Manufactured/Factory Built Building


Current Submittal

Submittal #2) Permit Application Submittal (08/23/2023)

Type Status Date Verified
State Approved Plans for Manufactured-Factory Built Buildings

State Approved Plans for Manufactured-Factory Built Buildings

Additional Information

For foundation only permit these can be submitted at a later time
Pending
Extended Description: Colorado State law says that if documents are prepared by a licensed professional, that professional must sign and seal them. NOTE this is only required if its Factory Built or Manufactured Buildings.

No documents are required at this time.

Structural Plans

Structural Plans

Additional Information

Colorado State law says that if documents are prepared by a licensed professional, that professional must sign and seal them. Required for any Structural Alterations, Additions, or New Construction.
Received 08/24/2023
Extended Description: Colorado State law says that if documents are prepared by a licensed professional, that professional must sign and seal them. Required for any Structural Alterations, Additions, or New Construction.

No documents are required at this time.

MEP Plans

MEP Plans

Additional Information

These submittals are required for all New Construction of Additions
Received 08/24/2023
Extended Description: These submittals are required for all New Construction of Additions

No documents are required at this time.

Heat Load Calculations

Heat Load Calculations

Additional Information

Can be a deferred submittal.
Pending
Extended Description: These submittals are required for all New Construction of Additions

No documents are required at this time.

Site Plan

Site Plan

Additional Information

Colorado State law says that if documents are prepared by a licensed professional, that professional must sign and seal them. Required for all construction work that will be expanding outward or upward from the existing building, and for all fences, signs and retaining walls being added.
Received 08/24/2023
Extended Description: Colorado State law says that if documents are prepared by a licensed professional, that professional must sign and seal them. Required for all construction work that will be expanding outward or upward from the existing building, and for all fences, signs and retaining walls being added.

No documents are required at this time.

Soil Report

Soil Report

Additional Information

These submittals are required for all New Construction or Additions
Received 08/24/2023
Extended Description: These submittals are required for all New Construction or Additions

No documents are required at this time.

Foundation Only Agreement Form

Foundation Only Agreement Form

Additional Information

Foundation only agreement form
Received 08/24/2023
Extended Description: Foundation only agreement form

No documents are required at this time.

Installation Authorization Form

Installation Authorization Form

Additional Information

Can be submitted when state approved plans are submitted.
Pending
Extended Description: Installation Authorization Form

No documents are required at this time.

Architectural Plans

Architectural Plans

Additional Information

Can be submitted when state approved plans are submitted.
Received 08/24/2023
Extended Description: Architectual Plans

No documents are required at this time.

Previous Submittals

1) Permit Application Submittal (08/08/2023)Submittal #

Type Status Date Verified
State Approved Plans for Manufactured-Factory Built Buildings

State Approved Plans for Manufactured-Factory Built Buildings

Additional Information

For foundation only permit these can be submitted at a later time
Pending
Photos

Photos

Additional Information

No Additional Information Available.
Not Required
Construction Specifications

Construction Specifications

Additional Information

These submittals are required for all New Construction of Additions
Not Required
MEP Plans

MEP Plans

Additional Information

These submittals are required for all New Construction of Additions
Pending
Heat Load Calculations

Heat Load Calculations

Additional Information

Can be a deferred submittal.
Pending
Civil Plans

Civil Plans

Additional Information

Colorado State law says that if documents are prepared by a licensed professional, that professional must sign and seal them. These submittals are required for all New Construction or Additions:
Not Required
Landscape plan

Landscape plan

Additional Information

Colorado State law says that if documents are prepared by a licensed professional, that professional must sign and seal them. Only required for new commercial buildings.
Not Required
Utility Plan

Utility Plan

Additional Information

These submittals are required for all New Construction or Additions: Not Available is utility work permit also needed for that
Not Required
Installation Authorization Form

Installation Authorization Form

Additional Information

Can be submitted when state approved plans are submitted.
Pending
Architectural Plans

Architectural Plans

Additional Information

Can be submitted when state approved plans are submitted.
Pending
Returned for Corrections

Returned for Corrections

Additional Information

No Additional Information Available.
Pending
Structural Plans

Structural Plans

Additional Information

Colorado State law says that if documents are prepared by a licensed professional, that professional must sign and seal them. Required for any Structural Alterations, Additions, or New Construction.
Received 08/09/2023
Site Plan

Site Plan

Additional Information

Colorado State law says that if documents are prepared by a licensed professional, that professional must sign and seal them. Required for all construction work that will be expanding outward or upward from the existing building, and for all fences, signs and retaining walls being added.
Received 08/09/2023
Soil Report

Soil Report

Additional Information

These submittals are required for all New Construction or Additions
Received 08/09/2023
Foundation Only Agreement Form

Foundation Only Agreement Form

Additional Information

Foundation only agreement form
Received 08/09/2023