CityView Portal

Permit Application Status

PRAB220721


You will only be able to schedule inspections if you are a contact on the permit application.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRAB220721
Accessory Building
Closed
JMS BEAR CREEK RANCH LLC
New
New riding arena. This is an entirely open structure inside with no internal walls, no plumbing, and a dirt floor.
06/09/2022
06/29/2022
06/29/2025
07/03/2023

Locations

Submittals

1 Permit Application Submittal 06/09/2022      Status: Returned for Correction
Review Type Outcome Est. Completion Date Completed
Building Code Review Failed 06/24/2022 06/20/2022
Planning Review Failed 06/24/2022 06/10/2022

2 Permit Application Submittal 06/21/2022      Status: Returned for Correction
Review Type Outcome Est. Completion Date Completed
Building Code Review Approved 06/30/2022 06/24/2022
Planning Review Failed 06/30/2022 06/24/2022

3 Permit Application Submittal 06/27/2022      Status: Pending
Review Type Outcome Est. Completion Date Completed
COO Review - Building Code Approved 07/03/2023 07/03/2023
COO Review - Building Code Failed 06/06/2023 06/06/2023
Planning Review Approved 07/11/2022 07/06/2022
Planning Review Approved 07/05/2022 06/28/2022

Fees

There are no fees for this permit application, or you are not authorized to view them.

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection Partial Pass 8/1/2022 8/1/2022 08/03/2022
Silas Ebbert ((970) 870-5347)   Send Email
Foundation Inspection Not Ready 8/4/2022 8/4/2022 08/04/2022
Silas Ebbert ((970) 870-5347)   Send Email
Foundation Inspection Passed 8/11/2022 8/11/2022 08/11/2022
Silas Ebbert ((970) 870-5347)   Send Email
Foundation Drain Inspection Passed 8/25/2022 8/25/2022 08/25/2022
Silas Ebbert ((970) 870-5347)   Send Email
Footing Inspection Passed 9/2/2022 9/2/2022 09/02/2022
Silas Ebbert ((970) 870-5347)   Send Email
Drywall Inspection VOID 05/30/2023
Silas Ebbert ((970) 870-5347)   Send Email
Insulation Inspection VOID 05/30/2023
Silas Ebbert ((970) 870-5347)   Send Email
Roofing Inspection VOID 05/30/2023
Silas Ebbert ((970) 870-5347)   Send Email
Framing Inspection VOID 05/30/2023
Silas Ebbert ((970) 870-5347)   Send Email
Building Final Inspection Partial Pass 5/26/2023 5/30/2023 05/30/2023
Silas Ebbert ((970) 870-5347)   Send Email
Corrections:


Miscellaneous
Carried Forward
05/30/2023
1. Install missing washers and make sure all anchor bolt nuts are tight

Grading Inspection VOID 06/06/2023
Heidi Spengler ((970) 870-5332)   Send Email
Final Grading Inspection VOID 06/06/2023
Heidi Spengler ((970) 870-5332)   Send Email
Building Final Inspection Passed 6/26/2023 06/26/2023
Ron Norton ((970) 870-5331)   Send Email
Corrections:


Miscellaneous
Resolved
06/26/2023
1. Install missing washers and make sure all anchor bolt nuts are tight

Conditions

There are no conditions for this permit application, or you are not authorized to view them.

Related Permit & Planning Applications

There are no related items for this permit application.

Documents & Images

Date Uploaded File Type Name
06/09/2022 Receipt Receipt for transaction:2022-000587
06/21/2022 Letter Permit Review Corrections Notice (Generate/Send Correction Notice)
06/22/2022 Letter Incomplete Application Notice (Generate Incomplete Resubmittal Notice)
06/27/2022 Letter Permit Review Corrections Notice (Generate/Send Correction Notice)
06/29/2022 Plans Buckethead #2 (Received) (Stamped)
06/29/2022 Plans Review response comments (Received) (Stamped)
06/29/2022 Plans BUCKH22B 6-22-22 (1) (Received) (Stamped)
06/29/2022 Plans Buckethead_Arena_Permit_4_24_22_AESfoundation plan (Received) (Stamped)
06/29/2022 Plans 104129 Certified ABPT PEMB plans (Received) (Stamped)
06/29/2022 Report SOIL 21-12526 Buckethead Ranch Riding Arena S&FI Report (1) (Stamped)
06/29/2022 Letter Permit - Detailed
06/29/2022 Receipt Receipt for transaction:2022-000699
07/11/2022 Plans BUCKH22F 7-2-22 SHEET 2 (Stamped)
07/11/2022 Plans BUCKH22E 7-2-22 SHEET 1 (Stamped)
08/03/2022 Report Inspection Report (Footing Inspection)
08/04/2022 Report Inspection Report (Foundation Inspection)
08/11/2022 Report Inspection Report (Foundation Inspection)
08/25/2022 Report Inspection Report (Foundation Drain Inspection)
09/02/2022 Report Inspection Report (Footing Inspection)
05/30/2023 Report Inspection Report (Building Final Inspection)
06/26/2023 Report Inspection Report (Building Final Inspection)
07/03/2023 Letter Certificate of Completion