PRAD250104


You will only be able to schedule inspections if you are a contact on the permit application.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRAD250104
Addition
Permit(s) Issued
SUMSKIS, KOLBY K & BOURQUE, CASEY JAMES (JT)
Addition
New garage with large mudroom + laundry on main level. Second level to have new primary suite.
02/24/2025
03/31/2025

Locations

Submittals

1 Permit Application Submittal 02/24/2025      Status: Returned for Correction

Documents Returned For Corrections

Review Type Outcome Est. Completion Date Completed
Environmental Health Review Failed 03/19/2025 03/17/2025
Public Works Review Failed 03/19/2025 03/17/2025
Building Code Review Approved 03/19/2025 03/11/2025
Planning Review Failed 03/19/2025 03/10/2025
Fire Code Review Failed 03/19/2025 03/08/2025
GIS Land Development Review Approved 03/19/2025 03/07/2025

2 Permit Application Submittal 03/17/2025      Status: Pending
Review Type Outcome Est. Completion Date Completed
Environmental Health Review Approved 03/28/2025 03/28/2025
Fire Code Review Approved 03/28/2025 03/26/2025
Planning Review Approved 03/28/2025 03/24/2025
Public Works Review Approved 03/28/2025 03/24/2025

Fees

Paid Fees Amount Paid Owing Date Paid
Steamboat Springs Fire Site Visit/Driveway Inspection $120.00 $120.00 Paid 03/28/2025
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Framing Inspection Pending
Wall/Roof Sheeting Pending
Roofing Inspection Pending
Insulation Inspection Pending
Radon Piping Pending
Shower Pan Inspection Pending
Drywall Inspection Pending
Grading Inspection Pending
Mike Mordi   Send Email
Final Grading Inspection Pending
Tony Brown ((970) 870-5344)   Send Email
Lath/Veneer Inspection Pending
Building Final Inspection Pending
Structural Inspection Pending
Foundation/Underslab Insulation Pending
Footing Inspection Passed 4/9/2025 4/10/2025 04/10/2025
Jeff Yeiser ((970) 870-5371)   Send Email
Foundation Inspection Passed 4/15/2025 4/16/2025 04/16/2025
Jeff Yeiser ((970) 870-5371)   Send Email
Foundation/Underslab Insulation Partial Pass 4/22/2025 4/22/2025 04/22/2025
Jeff Yeiser ((970) 870-5371)   Send Email
Foundation Water Proofing Passed 4/22/2025 4/22/2025 04/22/2025
Jeff Yeiser ((970) 870-5371)   Send Email
Foundation Drain Inspection Passed 4/22/2025 4/22/2025 04/22/2025
Jeff Yeiser ((970) 870-5371)   Send Email

Conditions

Condition Status Category
Miscellaneous Open Prior to Issuance of CO/CC
Planning and Land Use
Prior to CO/CA a final inspection is needed to verify chicken coop has been moved out of the setback, Green House has been moved out of the setback, and shed is at or under 120 sq ft [Greg Jaeger @ 03/21/2025 4:21 PM]
Final Fire Inspection Required Open Prior to Issuance of TCO/CO/CC
Fire Prevention
Final Driveway Inspection Required. New site plan was submitted 3-21-2025. Middleton did a site visit on 3-26-2025 and met with the owner. The the turnaround will fit on the site. Vegetation will have to be removed and gravel will have to be bought in to meet fire access standards for the turn around and turn out. Visit Fire Prevention, on www.steamboatsprings.net for details. Also the driveway must have better signage. Fire needs to do a driveway inspection before CO sign-off. [Mike Middleton @ 03/26/2025 4:55 PM]

Related Permit & Planning Applications

There are no related items for this permit application.

Documents & Images

Date Uploaded File Type Name
02/24/2025 Letter Incomplete Application Notice (Generate/Send Incomplete Application Notice)
03/03/2025 Receipt Receipt for transaction: 2025-000155
03/03/2025 Receipt Receipt for transaction: 2025-000155
03/03/2025 Letter Incomplete Application Notice (Generate/Send Incomplete Application Notice)
03/17/2025 Letter Permit Review Corrections Notice (Generate/Send Correction Notice)
03/28/2025 Plans Architectural 2025_03_04 (Received) (Stamped)
03/28/2025 Plans Site Plan 2025_03_21 (Stamped)
03/28/2025 Plans Structural 2-5-2025 (Received) (Stamped)
03/28/2025 Receipt Receipt for transaction: 2025-000251
03/31/2025 Permit Permit - Detailed (Generate/Issue Permit(s) - Building)
04/10/2025 Report Inspection Report (Footing Inspection)
04/16/2025 Report Inspection Report (Foundation Inspection)
04/22/2025 Report Inspection Report (Foundation/Underslab Insulation)
04/22/2025 Report Inspection Report (Foundation Water Proofing)
04/22/2025 Report Inspection Report (Foundation Drain Inspection)