Summary

PRSP221757
On-Site Wastewater
Closed
JONES, STEPHEN & BAXTER, AMY (JT)
New
Septic system for new construction
12/03/2022
02/13/2023
02/13/2024
03/07/2025

Locations

Submittals

1 Permit Application Submittal 12/03/2022      Status: Submittal Accepted
Review Type Outcome Est. Completion Date Completed
Environmental Health Review Approved 12/09/2022 12/29/2022

Fees

There are no fees for this development permit application, or you are not authorized to view them.

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Installation Inspection Passed w/ Conditions 06/28/2023
Christopher Peters ((970) 870-5354)   Send Email
Preliminary Soil Classification Passed 06/28/2023
Christopher Peters ((970) 870-5354)   Send Email
Confirm Design Engineer final docs Passed 03/07/2025
Christopher Peters ((970) 870-5354)   Send Email

Conditions

Condition Status Category
Design Engineer on-site Wastewater final report Resolved Prior to Issuance
Environmental Health
Design Engineer on-site Wastewater final report, including as Built plans received 3/6/2025 [Christopher Peters @ 03/07/2025 11:22 AM]

Related Permit & Planning Applications

Reference Number Status Type
PRPF221773 Closed Manufactured/Factory Built Building
PREL230646 Closed Electrical
PRPL230755 Closed Plumbing

Documents & Images

Date Uploaded File Type Name
12/03/2022 Plans OWTS Design 28395 Yellow Jacket 12-3-22
12/03/2022 Plans Site Plan 28395 Yellow Jacket 12-3-22
01/14/2023 Receipt Receipt for transaction:2023-000032
03/07/2025 12605 Jones Yellow Jacket Drive OWTS Observations