Review Type |
Outcome |
Est. Completion Date |
Completed |
COO Review - Environmental Health
|
Approved
|
12/07/2023
|
11/30/2023
|
|
|
|
As built report from Design Engineer received. Conditions Closed
|
COO Review - Building Code
|
Failed
|
06/30/2023
|
06/30/2023
|
|
|
|
Need to pass final electrical inspection
|
COO Review - Building Code
|
Failed
|
05/25/2022
|
06/30/2023
|
|
|
|
|
COO Review - Fire Code
|
Approved
|
05/25/2022
|
05/23/2022
|
|
|
|
CO Approved - SY
|
COO Review - Planning
|
Approved
|
05/25/2022
|
05/18/2022
|
|
|
|
Not inspected for zoning compliance.
|
COO Review - Environmental Health
|
Failed
|
05/25/2022
|
05/18/2022
|
|
|
|
Final Observations from Engineer have not been received (NWCC) Original OWTS was 20-151 which is void due to number of bedrooms increasing to 4. Upload final observations and reach out to EH when complete
|
Building Code Review
|
Approved w/ Conditions
|
|
10/12/2020
|
|
SysAdmin
|
|
VP legacy plan review: Routt Building
sysadmin - Sep 9 2020 9:05AM - Plan review process started
sysadmin - Sep 17 2020 2:08PM - Plan review emailed to Nathan and uploaded to BB.
sysadmin - Oct 12 2020 5:20PM - See redlines on Record set and reivew letter for conditions of approval.
|
Road and Bridge Review
|
Approved
|
|
10/09/2020
|
|
SysAdmin
|
|
VP legacy plan review: Routt Road & Bridge/Engineering
sysadmin - Sep 24 2020 10:08AM - emailed applicant requesting cut/fill amounts 9/24
sysadmin - Oct 8 2020 8:51AM - G&E TRO-20-139 Pending
sysadmin - Oct 9 2020 10:16AM - G&E RO-20-139 approved and issued
|
Planning Review
|
Approved
|
|
09/21/2020
|
|
SysAdmin
|
|
VP legacy plan review: Routt Planning/Zoning
sysadmin - Sep 10 2020 2:57PM - Proposed new SFR on a currently vacant 6.78 acre parcel zoned AF that is part of the Marabou Filing 1 LPSE. The proposed location is within the platted building envelope and meets setbacks. No waterbody setback concerns exist. The location of the structure appears to be located in a skyline zoned area, the applicant has been contacted to schedule a skyline test.
sysadmin - Sep 21 2020 11:56AM - Skyline test conducted based upon location and height of sumbitted building plans and it was determined that the structure will not be skylined. All zoning requirements have been met.
|
External Agencies Review
|
Approved
|
|
09/18/2020
|
|
SysAdmin
|
|
VP legacy plan review: YVEA
sysadmin - Sep 18 2020 7:29AM - Meter and meter pedestal are to be located as described by YVEA. They shall not be enclosed, covered or concealed. Violation shall result in termination of service.
sysadmin - Sep 18 2020 7:29AM - This approval addresses only the meter and service location.
|
Fire Code Review
|
Approved w/ Conditions
|
|
09/17/2020
|
|
SysAdmin
|
|
VP legacy plan review: Steamboat Fire Rural
sysadmin - Sep 17 2020 1:50PM - Conditionally approved- pending resubmittal of site plan with access width, grade, turning radius and turnaround meeting Fire Dept. access requirements or if unable to meet requirements submittal of fire sprinkler and monitored fire alarm plans and permits. No inspections past foundation until the above is resolved.
sysadmin - Sep 17 2020 1:50PM - Conditionally Approved –NO INSPECTIONS deferred submittal until RECEIPT of Fire Alarm/Sprinkler plan/permits by sub-contractor to Fire Prevention. See www.steamboatsprings.net, Fire and EMS Services, Fire Prevention, Downloadable Permits and Forms
|
Environmental Health Review
|
Approved
|
|
09/17/2020
|
|
SysAdmin
|
|
VP legacy plan review: Routt Environmental Health
sysadmin - Sep 9 2020 4:04PM - Emailed applicant with OWTS requirements
sysadmin - Sep 16 2020 10:07AM - Application and design submitted. Fee required.
sysadmin - Sep 17 2020 8:37AM - Payment rec'd 9/16/20. Currently under review with EH
sysadmin - Sep 17 2020 9:59AM - Design reviewed an approved.
|
GIS Land Development Review
|
Approved
|
|
09/11/2020
|
|
SysAdmin
|
|
VP legacy plan review: Routt Addressing/GIS
|
Electrical Review
|
Complete
|
|
09/09/2020
|
|
SysAdmin
|
|
VP legacy plan review: Routt Electrical Plan Review
|
External Agencies Review
|
Complete
|
|
09/09/2020
|
|
SysAdmin
|
|
VP legacy plan review: Atmos Energy
|