CityView Portal

Permit Application Status

PRPF231764


You will only be able to schedule inspections if you are a contact on the permit application.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRPF231764
Manufactured/Factory Built Building
Permit(s) Issued
ROUTT COUNTY
New
U - Utility, miscellaneous
Construction of Town of Phippsburg wastewater treatment plant including site-built, below-ground tanks that also serve as the foundation for placement of factory-built, modular, containerized treatment facility on top of tanks.
12/27/2023
05/15/2024
05/15/2027

Locations

Submittals

1 Permit Application Submittal 12/27/2023      Status: Returned for Correction
Review Type Outcome Est. Completion Date Completed
Fire Code Review Approved 02/23/2024 02/29/2024
Public Works Review Approved 02/23/2024 02/29/2024
External Agencies Review Approved 02/23/2024 02/23/2024
Electrical Review Approved 02/23/2024 02/23/2024
Building Code Review Failed 02/23/2024 02/16/2024
Environmental Health Review Approved 02/23/2024 02/16/2024
GIS Land Development Review VOID 02/23/2024 01/05/2024
Planning Review Failed 02/23/2024 01/04/2024

2 Permit Application Submittal 03/01/2024      Status: Pending
Review Type Outcome Est. Completion Date Completed
Building Code Review Approved 10/17/2024 10/10/2024
Planning Review Approved 05/17/2024 05/13/2024
Building Code Review Approved 05/17/2024 05/13/2024

Fees

There are no fees for this permit application, or you are not authorized to view them.

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Foundation Drain Inspection Pending
Foundation Water Proofing Pending
Foundation/Underslab Insulation Pending
Wall/Roof Sheeting Pending
Radon Piping Pending
Drywall Inspection Pending
Final Grading Inspection Pending
Tony Brown ((970) 870-5344)   Send Email
Lath/Veneer Inspection Pending
Building Final Inspection Pending
Framing Inspection Pending
Foundation Inspection Partial Pass 6/3/2024 06/04/2024
Jeff Yeiser ((970) 870-5371)   Send Email
Footing Inspection Partial Pass 6/4/2024 6/4/2024 06/04/2024
Jeff Yeiser ((970) 870-5371)   Send Email
Foundation Inspection Partial Pass 6/17/2024 6/17/2024 06/17/2024
Jeff Yeiser ((970) 870-5371)   Send Email
Footing Inspection Passed 8/5/2024 8/5/2024 08/05/2024
Ron Norton ((970) 870-5331)   Send Email
Foundation Inspection Passed 8/5/2024 8/5/2024 08/05/2024
Ron Norton ((970) 870-5331)   Send Email
Framing Inspection Partial Pass 3/5/2025 3/5/2025 03/05/2025
Todd Carr ((970) 870-5330)   Send Email
Framing Inspection Partial Pass 3/12/2025 3/11/2025 03/12/2025
Todd Carr ((970) 870-5330)   Send Email

Conditions

Condition Status Category
Final Fire Inspection Required Resolved Prior to Issuance of TCO/CO/CC
Final Fire Inspection Required 1. Hazardous Materials placard required on outside of building. 2. Local Monitoring for gas detection with outside strobe light. 3. Signage with Emergency Contact on outside of building. Questions? Contact Oak Creek Fire Protection District at permits@oakcreekfire.org [Bob Reilley @ 02/29/2024 2:44 PM]
Building Department Conditions to be Completed Resolved Prior to Issuance of TCO/CO/CC
Building Services
Special inspection on welds performed to hold unit to concrete pad. [Todd Carr @ 03/05/2025 3:17 PM]

Related Permit & Planning Applications

Reference Number Status Type
PREL240742 Permit(s) Issued Electrical

Documents & Images

Date Uploaded File Type Name
12/27/2023 newterra Enclosures Standards
12/27/2023 Report Soils Report
12/27/2023 Plans Electrical Drawings
12/27/2023 PermitSummaryPburg_Letter_2023_12_27
12/27/2023 Photograph 20211109_145634549_iOS
12/27/2023 Photograph 20211109_145648133_iOS
12/29/2023 Receipt Receipt for transaction:2023-001721
03/01/2024 Letter Permit Review Corrections Notice (Generate/Send Correction Notice)
03/01/2024 Plans Final Structural Calculations - Phippsburg 11_13_23 (Received)
05/02/2024 PermitSummaryPburg_ResubmitalLetter_2024_05_02
05/02/2024 Plans DensDeck_Prime_Spec
05/02/2024 Plans 2024-03-01 Phippsburg WWTP (Structural Drawings)-Stamped
05/02/2024 Plans 2024-04-16 Phippsburg Screen Building (Dwgs)-Stamped
05/02/2024 Plans 2024-03-01 Phippsburg WWTP (Structural Calcs)-Stamped
05/02/2024 Plans 2024-04-12 Phippsburg Screen Building (Calcs)-Stamped
05/03/2024 Letter Incomplete Application Notice (Generate Incomplete Resubmittal Notice)
05/13/2024 Form Foundation Only Permits Policy Form_PhippsburgWWTP_PRPF231764 (Received)
05/13/2024 Plans Phippsburg WWTP General Civil Process Drawings (Received) (Stamped)
05/15/2024 Letter Permit - Detailed
05/15/2024 Receipt Receipt for transaction:2024-000513
06/04/2024 Report Inspection Report (Foundation Inspection)
06/04/2024 Report Inspection Report (Footing Inspection)
06/17/2024 Report Inspection Report (Foundation Inspection)
10/09/2024 Form DOLA Permit_NR-0006273 specs
10/09/2024 Plans DOLA Appvd Plans_NR-0006273
10/10/2024 PermitSummaryPburg_ResubmitalLetter_2024_10_03 (Stamped)
10/10/2024 Report Phippsburg Heat Calc Package (Stamped)
10/10/2024 Plans Phippsburg Weld Calcs (Stamped)
10/10/2024 Plans Full_Phippsburg WWTP Structural Drawings_Oct2024 (Stamped)
10/15/2024 Permit Permit - Detailed
03/05/2025 Report Inspection Report (Framing Inspection)
03/12/2025 Report Inspection Report (Framing Inspection)