Summary

PRAU220714
Secondary Dwelling Unit
Closed
LESLIE CHRISTENSEN LIVING TRUST DTD 10/1/2018
New
R-3 - Residential, one- and two-family
Permitting for an existing SDU that lies inside unpermitted detached Accessory Structure. **SDU is on the ground level, with an upper-level conversion to office** 635 sq ft , 1 bedroom, 1 bath one level unit
06/09/2022
06/16/2023
06/16/2026
10/13/2023

Locations

Submittals

1 Permit Application Submittal 06/09/2022      Status: Returned for Correction
Review Type Outcome Est. Completion Date Completed
Fire Code Review Approved 09/26/2022 09/26/2022
Public Works Review Approved 09/26/2022 09/26/2022
Building Code Review Failed 09/26/2022 09/21/2022
GIS Land Development Review Failed 09/26/2022 09/14/2022
Environmental Health Review Failed 09/26/2022 09/14/2022
Planning Review Failed 09/26/2022 09/13/2022

2 Permit Application Submittal 09/27/2022      Status: Returned for Correction
Review Type Outcome Est. Completion Date Completed
Environmental Health Review Failed 11/22/2022 01/05/2023
Building Code Review Approved 11/22/2022 11/16/2022
GIS Land Development Review Failed 11/22/2022 11/16/2022
Planning Review Failed 11/22/2022 11/15/2022

3 Permit Application Submittal 01/06/2023      Status: Returned for Correction
Review Type Outcome Est. Completion Date Completed
Environmental Health Review Failed 03/16/2023 03/22/2023
GIS Land Development Review Approved 03/16/2023 03/14/2023
Planning Review Approved 03/16/2023 03/09/2023

4 Permit Application Submittal 03/23/2023      Status: Pending
Review Type Outcome Est. Completion Date Completed
COO Review - Building Code Approved 10/12/2023 10/13/2023
COO Review - Planning Approved 10/12/2023 10/05/2023
COO Review - Environmental Health Approved 09/14/2023 09/15/2023
COO Review - Building Code Failed 09/14/2023 09/14/2023
COO Review - Public Works Approved 09/14/2023 09/11/2023
Environmental Health Review Approved 06/06/2023 05/30/2023

Fees

There are no fees for this permit application, or you are not authorized to view them.

Inspections

Inspection Outcome Requested Scheduled Date Inspected
Electrical Final Inspection Not Ready 7/25/2023 7/26/2023 07/26/2023
Tom Cook ((970) 870-5339)   Send Email
Building Final Inspection Partial Pass 7/26/2023 07/27/2023
Silas Ebbert ((970) 870-5347)   Send Email
Drywall Inspection Partial Pass 8/10/2023 8/10/2023 08/10/2023
Todd Carr ((970) 870-5330)   Send Email
Drywall Inspection Partial Pass 8/14/2023 8/14/2023 08/14/2023
Todd Carr ((970) 870-5330)   Send Email
Drywall Inspection Partial Pass 8/15/2023 8/15/2023 08/15/2023
Silas Ebbert ((970) 870-5347)   Send Email
Drywall Inspection Passed 9/5/2023 9/6/2023 09/06/2023
Silas Ebbert ((970) 870-5347)   Send Email
Building Final Inspection Partial Pass 9/7/2023 9/7/2023 09/07/2023
Silas Ebbert ((970) 870-5347)   Send Email
Footing Inspection VOID 09/07/2023
Heidi Spengler ((970) 870-5332)   Send Email
Foundation Inspection VOID 09/07/2023
Heidi Spengler ((970) 870-5332)   Send Email
Foundation Drain Inspection VOID 09/07/2023
Heidi Spengler ((970) 870-5332)   Send Email
Framing Inspection VOID 09/07/2023
Heidi Spengler ((970) 870-5332)   Send Email
Roofing Inspection VOID 09/07/2023
Heidi Spengler ((970) 870-5332)   Send Email
Insulation Inspection VOID 09/07/2023
Heidi Spengler ((970) 870-5332)   Send Email
Structural Inspection VOID 09/07/2023
Heidi Spengler ((970) 870-5332)   Send Email
Foundation Water Proofing VOID 09/07/2023
Heidi Spengler ((970) 870-5332)   Send Email
Foundation/Underslab Insulation VOID 09/07/2023
Heidi Spengler ((970) 870-5332)   Send Email
Lath/Veneer Inspection VOID 09/07/2023
Heidi Spengler ((970) 870-5332)   Send Email
Radon Piping VOID 09/07/2023
Heidi Spengler ((970) 870-5332)   Send Email
Shower Pan Inspection VOID 09/07/2023
Heidi Spengler ((970) 870-5332)   Send Email
Wall/Roof Sheeting VOID 09/07/2023
Heidi Spengler ((970) 870-5332)   Send Email
Electrical Final Inspection VOID 09/07/2023
Heidi Spengler ((970) 870-5332)   Send Email
Grading Inspection VOID 09/11/2023
Tony Brown ((970) 870-5344)   Send Email
Final Grading Inspection VOID 09/11/2023
Tony Brown ((970) 870-5344)   Send Email
Building Final Inspection Passed 10/5/2023 10/6/2023 10/06/2023
Jeff Yeiser ((970) 870-5371)   Send Email

Conditions

Condition Status Category
Design Engineer on-site Wastewater final report Resolved Prior to Issuance
Environmental Health
Design Engineer on-site Wastewater final report, including as Built plans.
Miscellaneous Resolved Prior to Issuance of TCO/CO/CC
Environmental Health
Below is a list of items that are out of compliance and needing correction associated with the OWTS system at 38625 Rolling Hills Lane. Corrective actions are listed in red. • At the northwest corner of the metal shop/Secondary Dwelling Unit, it appears the Septic Line (cleanout) and potable water spigot are located in the same trench. Potable water lines and septic lines are required to have a minimum separation of five feet from each other. Minor corrections are available if the lines cross perpendicularly, but the lines cannot run parallel to each other for any real distance. Please excavate at the NW corner of the SDU so the potable and sewer lines can be inspected. Corrective action can be determined once this inspection is complete. • Septic Line cleanouts are required at least every 100 feet of septic lines. It appears there is a run of over 200’ between the SDU cleanout and the next available cleanout. Install additional cleanouts so that there is no more than 100’ between each riser. • An unpermitted bathhouse was observed at the property with two sinks, two toilets, and two showers connected to the existing OWTS. The toilet and showers fixtures must be removed, abandoned, and rendered inoperable. This includes capping the shower head and toilet supply line and filling the toilet septic connection with grout or removing the lines. • A septic line cleanout was located in a cabinet in the lower level mechanical room of the home. These cleanouts are typically located at the exterior of the building. RCDEH is willing to make an exemption on this as long as the cleanout remains accessible and it is understood that the cabinet may need to be removed for servicing. • The distribution box at the top of the soil treatment area (STA) should be located and made accessible for servicing. Based on correspondence with the homeowner, it appears this infraction has been rectified and should be field verified by RCDEH. Soil Treatment Area • The as-built drawing indicates that four runs of septic chambers were installed in the STA. Inspection ports were located for three of the four runs. One of the ports could not be located. The inspection pipes that were located were at grade and two of the three caps were damaged and/or missing, exposing the STA to infiltration of sediment, debris, and potentially rodents from the ground surface. • It appears the northern most run in the STA is beginning to migrate down the adjacent hillside or possibly lacks adequate cover, and multiple animal burrows were observed along the north side of the STA. • Soil cover over the STA in general appears thin in areas. Inspection riser pipes should extend 4’ above the ground surface and be properly capped A certified inspector or engineer should verify that the STA is functioning properly, check that there is proper coverage of the STA, and that the STA is not migrating to the north and downhill. An inspection report should be submitted to RCDEH. Please contact RCDEH with any questions regarding this system. Thank you

Related Permit & Planning Applications

There are no related items for this permit application.

Documents & Images

Date Uploaded File Type Name
06/09/2022 Receipt Receipt for transaction:2022-000583
06/13/2022 Letter Incomplete Application Notice (Generate/Send Incomplete Application Notice)
09/27/2022 Letter Permit Review Corrections Notice (Generate/Send Correction Notice)
09/27/2022 Plans Christensen Garage Shed RCRBD Letter 2022_08_25 (1) (Received)
11/03/2022 Email Permit Application Expiration Notice PRAU220714
01/06/2023 Letter Permit Review Corrections Notice (Generate/Send Correction Notice)
01/06/2023 Plans PRAU220714 Work Description Change (Received)
01/06/2023 Plans Christensen SDU RCRBD Response 2022_11_08 (Received)
03/13/2023 Other AddressNotification2023_38625UnitB
03/23/2023 Letter Permit Review Corrections Notice (Generate/Send Correction Notice)
05/31/2023 Plans Christensen Garage Shed RCRBD 2022_08_24 (Received) (Stamped)
05/31/2023 Plans Christensen Garage Plans 2022_11_08r (Received) (Stamped)
05/31/2023 Receipt Receipt for transaction: 2023-000522
06/16/2023 Permit Permit - Detailed (Generate/Issue Permit(s) - Building)
07/26/2023 Report Inspection Report (Electrical Final Inspection)
07/27/2023 Report Inspection Report (Building Final Inspection)
08/10/2023 Report Inspection Report (Drywall Inspection)
08/14/2023 Report Inspection Report (Drywall Inspection)
08/15/2023 Report Inspection Report (Drywall Inspection)
09/06/2023 Report Inspection Report (Drywall Inspection)
09/07/2023 Report Inspection Report (Building Final Inspection)
10/06/2023 Report Inspection Report (Building Final Inspection)
10/13/2023 Other Certificate of Occupancy