Permit Application Status
PRSF240226
You will only be able to schedule inspections if you are a contact on the permit application.
Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.
There are no fees for this permit application, or you are not authorized to view them.
Inspection | Outcome | Requested | Scheduled | Date Inspected |
---|---|---|---|---|
Footing Inspection | Pending | |||
Foundation Inspection | Pending | |||
Foundation Drain Inspection | Pending | |||
Foundation Water Proofing | Pending | |||
Insulation Inspection | Pending | |||
Drywall Inspection | Pending | |||
Grading Inspection | Pending | |||
Mike Mordi Send Email | ||||
Final Grading Inspection | Pending | |||
Tony Brown ((970) 870-5344) Send Email | ||||
Lath/Veneer Inspection | Pending | |||
Building Final Inspection | Pending | |||
Structural Inspection | Pending | |||
Shower Pan Inspection | Pending | |||
Radon Piping | Pending | |||
Footing Inspection | Passed | 4/26/2024 | 4/25/2024 | 04/25/2024 |
Silas Ebbert ((970) 870-5347) Send Email | ||||
Foundation Inspection | Passed | 4/25/2024 | 04/25/2024 | |
Silas Ebbert ((970) 870-5347) Send Email | ||||
Foundation/Underslab Insulation | Passed | 5/13/2024 | 5/13/2024 | 05/13/2024 |
Silas Ebbert ((970) 870-5347) Send Email | ||||
Wall/Roof Sheeting | Passed | 8/6/2024 | 8/6/2024 | 08/06/2024 |
Silas Ebbert ((970) 870-5347) Send Email | ||||
Framing Inspection | Not Ready | 8/6/2024 | 8/6/2024 | 08/06/2024 |
Silas Ebbert ((970) 870-5347) Send Email | ||||
Roofing Inspection | Passed | 8/6/2024 | 8/6/2024 | 08/06/2024 |
Silas Ebbert ((970) 870-5347) Send Email | ||||
Framing Inspection | Partial Pass | 8/19/2024 | 8/19/2024 | 08/19/2024 |
Silas Ebbert ((970) 870-5347) Send Email | ||||
Corrections:
Miscellaneous
Carried Forward
08/19/2024
Install shims where needed at great room framing
Install straps at inside of portal frame header
Get engineers approval for the following:
1. Great room wall not balloon framed, break in wall with top plate and rake wall, man door on north side of great room has only 1K2T studs, studs not needed in wall under double top plate and squash blocks
|
||||
Framing Inspection | Passed | 10/2/2024 | 10/2/2024 | 10/02/2024 |
Silas Ebbert ((970) 870-5347) Send Email | ||||
Corrections:
Miscellaneous
Resolved
10/02/2024
Install shims where needed at great room framing
Install straps at inside of portal frame header
Get engineers approval for the following:
1. Great room wall not balloon framed, break in wall with top plate and rake wall, man door on north side of great room has only 1K2T studs, studs not needed in wall under double top plate and squash blocks
|
||||
Shower Pan Inspection | Not Ready | 10/7/2024 | 10/7/2024 | 10/07/2024 |
Silas Ebbert ((970) 870-5347) Send Email | ||||
Radon Piping | Not Ready | 10/7/2024 | 10/7/2024 | 10/07/2024 |
Silas Ebbert ((970) 870-5347) Send Email |
Condition | Status | Category |
---|---|---|
Building Department Conditions to be Completed | Resolved | Prior to Rough Building Wall Inspections |
Building Services
RCRBD Building Official sent an email to DORA for approval of the Plans being done by a non-licensed Architect even though the company name contains the word Architectural. We need a response from DORA on approval before permit issuance. [Todd Carr @ 04/08/2024 12:21 PM]
Designer removed the word Architect from their name so they are not required to be licensed. [Malea Michael-Ferrier @ 12/05/2024 7:22 AM]
|
||
Design Engineer on-site Wastewater final report | Open | Prior to Issuance of CO/CC |
Environmental Health
Design Engineer on-site Wastewater final report, including as Built drawing. [Christopher Peters @ 04/17/2024 8:09 AM]
|
||
Blower door test results | Open | Prior to Issuance of TCO/CO/CC |
Building Services
Blower Door Test Results [Ted Allen @ 04/24/2024 9:08 AM]
|
||
Truss Drawings Deferred Submittal | Open | Prior to Insulaton Inspections Scheduled |
Building Services
Truss drawings shall be submitted, reviewed and approved prior to installation and inspections.2 With a gas boiler, there is insulation on the plans for a heated slab, however, a minimum of R-10 insulation is required from the top of the slab downward 48" is missing from the plans. [Ted Allen @ 04/24/2024 9:08 AM]
|
||
Miscellaneous | Open | Prior to Issuance of TCO/CO/CC |
Building Services
only one dwelling defined as any building or portion thereof which contains
living facilities, including provisions for sleeping, eating, cooking, and sanitation, as defined by the IRC, for not
more than one family is allowed without fire separation between dwellings. This plan check is based on the
information given and does not include any code requirements for use of this building other than described
above until changes are made and resubmitted as per Planning corrections and GIS address 2nd. [Ted Allen @ 04/24/2024 9:08 AM]
|
||
Heat Loss Calculations Deferred Submittal | Open | Prior to Mechanical Permit Issuance for Heat |
Building Services
Heal Load Calculations must be submitted, reviewed and approved prior to any heating equipment being installed. [Ted Allen @ 04/24/2024 9:08 AM]
|
||
Miscellaneous | Resolved | Prior to Rough Building Wall Inspections |
Building Services
Approved for F/O see condition: only one dwelling defined as any building or portion thereof which contains
living facilities, including provisions for sleeping, eating, cooking, and sanitation, as defined by the IRC, for not
more than one family is allowed without fire separation between dwellings. This plan check is based on the
information given and does not include any code requirements for use of this building other than described
above until changes are made and resubmitted as per Planning corrections and second address GIS
RCRBD has adopted the State of Colorado Model Electric and Solar Ready Code. Details shall include, but are not limited to, the following as applicable:
1. Location and size of the solar-ready zone.
2. Electrical capacity, appropriately phased branch circuit sized to accommodate future electric equipment and reserved physical space for circuit breakers in the main panel that are properly labeled.
3.An electric receptacle or junction box that meets the requirements of Section RE302.5, and pathways for routing of conduit from the solar-ready zone to the electrical service panel.
4. EV power transfer infrastructure requirements per 104.2.2 Electric Vehicle Ready.
4 Attics and enclosed rafter spaces formed where ceilings are applied directly to the underside of roof rafters shall have cross ventilation for each separate space by ventilating openings per R806.1 Ventilation required. Roof ventilation shall be provided in accordance with Section R806.1. Per local amendment in the WUI Code Class A Roofing Material, Roof Eaves and Soffits on commercial and residential new construction buildings only shall be protected on the exposed underside by one of the items per Section 504.3 including non-combustible materials or ignition resistant material in accordance with Section 503.2. We require ¼” or less non-combustible screening in roof and soffit vents, to help fight against ember intrusion into the attics or combustible spaces. Gutters and Downspouts shall be constructed of noncombustible material.
[Ted Allen @ 10/14/2024 7:51 AM]
|
||
Miscellaneous | Open | Prior to Issuance of TCO/CO/CC |
GIS
Address needs to be assigned and wayfinding discussed for the second residence since two homes will have the same access along CR37B.
|
||
Building Department Conditions to be Completed | Open | Prior to Rough Building Wall Inspections |
Building Services
Building Department Conditions to be Completed
NSF 30$ fee must be paid
|
Reference Number | Status | Type |
---|---|---|
PRSP240259 | Permit(s) Issued | On-Site Wastewater |
PREL240360 | Permit(s) Issued | Electrical |
PRPL240394 | Permit(s) Issued | Plumbing |
PRMH240395 | Permit(s) Issued | Mechanical |
Powered by CityView